PLUMBING GAS ELECTRICAL COURSES NATIONWIDE UK

CITY & GUILDS 6129 NVQ PLUMBING COURSES PART P
Careers Home
Plumbing
Qualifications
6129 Level 2
Water Regulations
Legionella L8
Part L1
Electrical
Gas
Plastering
Driving
Teaching
Nursing
Buy Tool Kits
Contact Us
Job Search

6129 Level 2

City & Guilds 6129 - Home Study - Intensive - Further Education Colleges 

Aimed at:  

Anyone looking at starting a new career and becoming a plumber

Current plumbing operatives who lack formal plumbing qualifications

Those with transferable skills from the heating and ventilating sector

 Qualifications

City & Guilds 6129 Levels 2 & 3 - NVQ 6089 Levels 2 & 3 In Plumbing

Learning structure

  • Practical plumbing training & assessments
  • Classroom theory sessions
  • Home study with written assignments
  • Online assessments (multi choice exams)
  • Basic Plumbing Skills 
  • Correct and safe use of tools and fittings
  • Soldering & bending copper tube
  • Jointing methods
  • Correct and practical uses of different materials and fixings 
  • Cloak Room Installation 
  • Mark out and plan assessment
  • Install first fix pipe work using copper tube and wall clips                                           
  • Install components & fittings to a toilet & basin
  • Secure fixing of sanitary appliances
  • Second fix pipe work to cloakroom suite appliances
  • Commission installation
  • Routine maintenance & fault finding 
  • Airing Cupboard Installation 
  • Decommission hot & cold water services including all sanitary ware
  • Install all fittings and components to a cold water storage cistern
  • Install all fittings and components to a hot water storage cylinder
  • Commission installation
  • Insulation of hot & cold water pipe work
  • Routine maintenance & fault finding
  • Bathroom Suite - Sanitary Ware Installation 
  • Use plastic speedfit plumbing systems to run first fix hot & cold water pipe work
  • Use plastic pushfit & solvent weld pipe to run first fix waste pipe sevices 
  • Dress sanitary ware with all fittings and components and securely fix in place
  • Second fix hot & cold water pipe work to sanitary appliances
  • Second fix plastic waste system to sanitary appliances
  • Commission bathroom installation/performance test sanitary waste system
  • Routine maintenance & fault finding
  • Combination Boiler/Jig Installation 
  • Decommission cold water storage cistern & hot water cylinder inc pipe work
  • Install a combination boiler jig in bathroom
  • Connect combi boilers hot & cold pipe work to the existing bathroom pipework               
  • Install a wall hung radiator in bathroom and connect flow & return to boiler
  • Commission the combi boilers hot water & heating system
  • Routine maintenance & fault finding 
  • Low Carbon Steel Pipework Installation  
  • Mark out fixings and radiator positions
  • Hanging radiators
  • Fixing wall mounted clips to wall
  • Install pipe work to radiators
  • Commision radiators
  • Routine maintenance & fault finding
     
  • Sheet Lead Weathering Installation/Fabrication 
  • Form a front apron
  • Step flashings with soakers
  • Back gutter with hood
  • Lead slate for soil pipe
  • Commission weathering set
  • Routine maintenance
      
  •  

    Sponsored Links

     

    Gas Safe Register

     

          

     

    Qualifications

     

     

    Awarding Bodies